Bid Sharp logo Bid Sharp

MEP Estimating Services: Mechanical, Electrical and Plumbing Takeoff

Mechanical, electrical, plumbing and fire-protection takeoffs and pricing from the contract documents.

Get a Free Quote
MEP Estimating

MEP Estimating Services covers the takeoff and pricing of mechanical (HVAC), electrical, plumbing and fire-protection systems from the engineering drawings and specifications.

We take off equipment, ductwork, piping, fixtures, devices and wiring by system and floor, and price materials, labor, insulation, supports and testing so mechanical, plumbing and electrical contractors can bid with confidence.

What we measure and price

ItemUnitNotes
HVAC equipment and unitsEAPer equipment schedule; curbs, pads, accessories
Ductwork and insulationLB / SFRectangular and round duct; fittings and hangers
Piping and fittingsLF / EABy size and material; valves and specialties
Plumbing fixtures and equipmentEAPer fixture schedule and risers
Fire-protection piping and headsLF / EAMains, branches, heads; per design
Electrical power and lightingEA / LFDevices, fixtures, conduit, wire
Controls, balancing and testingLSPer specification

Specifications and CSI MasterFormat references

MEP scopes span Divisions 21 (Fire Suppression), 22 (Plumbing), 23 (HVAC) and 26 (Electrical), with Division 25 Integrated Automation and Division 27–28 low-voltage sections when included. We read the specification section alongside the drawings so that products, performance requirements, testing, warranties and allowances are priced the way the solicitation intends — not just what appears on the plan sheets.

Pre-bid review: what we check before pricing

  • Scope definition: what is in your trade and what belongs to others, with inclusions and exclusions written down.
  • Addenda and bulletins: every addendum is logged and its effect on quantities, alternates and unit prices is carried into the estimate.
  • Requests for information (RFIs): conflicts between drawings and specifications are listed so they can be submitted before the question deadline.
  • Alternates, allowances and unit prices: priced separately and tied to the bid form so the proposal is complete and responsive.
  • Bid form and qualifications: required line items, bond and insurance requirements, prevailing-wage or Davis-Bacon language and any bid-day instructions are flagged.

Pricing considerations that move the number

  • Ceiling congestion and coordination drive labor.
  • Equipment lead times and pricing volatility affect buyout.
  • Insulation and fire-stopping are often overlooked scopes.
  • Design-build vs fully designed systems change risk allowances.

Submittals and shop drawings for this scope

MEP submittals are heavily coordination-driven: equipment data, sheet-metal and piping layouts and above-ceiling coordination.

  • Equipment submittals and performance data
  • Ductwork and piping coordination (shop) drawings
  • Above-ceiling and shaft coordination drawings
  • Test-and-balance, commissioning and start-up plans

We prepare shop drawings and submittal packages for many of these scopes, and we can resubmit after architect or engineer comments.

Common estimating mistakes we help you avoid

  • Missing insulation, fire-stopping, hangers, seismic bracing and access doors
  • Ignoring equipment lead times when carrying a buyout date
  • Assuming design-build systems are complete when the drawings are diagrammatic
  • Double-counting items shared between mechanical, plumbing and electrical

What you get

  • Marked-up plans showing every count and measurement
  • Quantity takeoff organized by discipline, system and floor
  • Material, labor, equipment and subcontract pricing (or takeoff only)
  • Clear assumptions, inclusions, exclusions, alternates and unit prices
  • Excel and PDF files ready to drop into your bid or post-bid scope sheets
  • Support on addenda, clarifications and bid leveling after delivery

Who this is for

Mechanical, plumbing and electrical subcontractors and GCs pricing the full MEP package.

How it works

  1. Upload your plans, specifications and addenda, or paste a plan-room link, with your bid due date.
  2. We confirm scope, price and turnaround before any work starts.
  3. Our estimators complete the takeoff and pricing and a second estimator reviews it.
  4. You receive the files and we stay available for addenda, RFIs and post-bid clarifications.

Software and standards

We take off in digital takeoff tools such as PlanSwift and Bluebeam Revu, price with RSMeans-style cost data and your own unit prices where you provide them, schedule in Oracle Primavera P6 or Microsoft Project when needed, and organize quantities by CSI MasterFormat (Divisions 21–23 and 26). Estimating is done remotely from your drawings, so we support public and private projects in every state.

Why contractors outsource mep estimating

Bid season compresses the time estimators have for each solicitation. Outsourcing the mep takeoff and pricing lets your team cover more bids, respond to addenda quickly and keep an independent check on subcontractor and supplier numbers. You keep control of the bid: you review the quantities, adjust unit costs and decide the final price.

Public, private and prevailing-wage projects

We price this scope on public solicitations (IFB, ITB and RFP responses) and private open-shop projects alike. When the solicitation includes a prevailing-wage or Davis-Bacon wage determination, we apply the stated rates and fringe benefits to the labor in each line item and allow for certified payroll administration. See public bid estimating and our prevailing wage guide.

Related services and pages

Combine this scope with quantity takeoff, bid leveling and proposal support, pre-bid and post-bid support, shop drawings and CPM scheduling. Browse every CSI division page, read the CSI MasterFormat guide or check the bidding glossary.

Frequently asked questions

Can you estimate only one discipline?

+

Yes. Order HVAC, plumbing, electrical or fire protection separately or as a full MEP package.

Do you handle design-build MEP?

+

We price from the information provided and state assumptions clearly where systems are not fully designed.

Bid Sharp at a glance: 3 steps, 50 states

Bid Sharp prepares construction estimates, takeoffs, shop drawings, structural and permit drawings and schedules for contractors and homeowners in all 50 states, on public and private projects. Typical turnaround is about 48 hours; the turnaround and a firm price are confirmed before any work starts.

  1. 1. Upload plans. Send PDF, DWG or a plan-room link with your bid due date.
  2. 2. Get a firm quote. Scope, price and turnaround in writing, with no obligation.
  3. 3. Receive deliverables. Excel and PDF files, plus DWG for drawings, checked by 2 team members.

Standards and official sources

Rules, wage rates, codes and procurement procedures change and differ by agency. Confirm the requirements that apply to your project with these primary sources and with the solicitation itself.

Keep exploring

Last updated by the Bid Sharp estimating team.

Call Upload Plans