Tile Estimating and Takeoff Services for Tile Contractors
Floor, wall and specialty tile takeoffs with waste, setting materials, waterproofing and trim for tile contractors.
Get a Free Quote
Tile Estimating Services is measuring and pricing floor tile, wall tile, mosaics, stone and their setting systems from the finish plans and schedules so a tile contractor can bid accurately.
Tile is a finish trade where layout drives waste. We measure by room and finish code, add realistic waste for pattern and format, and price tile, setting materials, waterproofing, grout, trim, transitions and movement joints.
What we measure and price
| Item | Unit | Notes |
|---|---|---|
| Floor tile | SF | By finish code; waste for pattern and format |
| Wall tile and backsplash | SF | Heights from elevations and room finish schedules |
| Base and trim pieces | LF | Bullnose, schluter-type trim, thresholds |
| Waterproofing and crack isolation | SF | Showers, wet areas, and decoupling membranes |
| Setting materials and grout | SF / BAG | Thinset, mortar bed, leveling, grout, sealer |
| Floor prep | SF | Self-leveling underlayment, slope, patching |
| Movement joints | LF | Per layout and tile council guidance |
Specifications and CSI MasterFormat references
Tile is specified in Division 09, such as 09 30 00 Tiling, 09 31 00 Thin-Set Tiling and 09 66 00 Terrazzo, along with waterproofing in Division 07 and the Tile Council of North America (TCNA) handbook methods. We read the specification section alongside the drawings so that products, performance requirements, testing, warranties and allowances are priced the way the solicitation intends — not just what appears on the plan sheets.
Pre-bid review: what we check before pricing
- Scope definition: what is in your trade and what belongs to others, with inclusions and exclusions written down.
- Addenda and bulletins: every addendum is logged and its effect on quantities, alternates and unit prices is carried into the estimate.
- Requests for information (RFIs): conflicts between drawings and specifications are listed so they can be submitted before the question deadline.
- Alternates, allowances and unit prices: priced separately and tied to the bid form so the proposal is complete and responsive.
- Bid form and qualifications: required line items, bond and insurance requirements, prevailing-wage or Davis-Bacon language and any bid-day instructions are flagged.
Pricing considerations that move the number
- Large-format tile and diagonal patterns raise waste and labor.
- Substrate flatness and prep can add significant cost.
- Wet-area waterproofing and slope work is priced separately from setting.
- Material allowances in the specification may differ from what is selected.
Submittals and shop drawings for this scope
Tile submittals normally include samples, layouts and setting-system data.
- Tile samples and grout color selections
- Tile layout and shop drawings showing cuts, patterns and movement joints
- Setting-material, waterproofing and membrane data
- Maintenance data
We prepare shop drawings and submittal packages for many of these scopes, and we can resubmit after architect or engineer comments.
Common estimating mistakes we help you avoid
- Ignoring layout-driven cuts and pattern waste
- Forgetting waterproofing, slope and substrate preparation
- Pricing tile only and leaving out trim, thresholds and grout
- Missing movement joints and sealants
What you get
- Marked-up plans showing every count and measurement
- Quantity takeoff organized by room, finish code and tile type
- Material, labor, equipment and subcontract pricing (or takeoff only)
- Clear assumptions, inclusions, exclusions, alternates and unit prices
- Excel and PDF files ready to drop into your bid or post-bid scope sheets
- Support on addenda, clarifications and bid leveling after delivery
Who this is for
Tile contractors and installers, general contractors, and homeowners or designers checking a tile scope.
How it works
- Upload your plans, specifications and addenda, or paste a plan-room link, with your bid due date.
- We confirm scope, price and turnaround before any work starts.
- Our estimators complete the takeoff and pricing and a second estimator reviews it.
- You receive the files and we stay available for addenda, RFIs and post-bid clarifications.
Software and standards
We take off in digital takeoff tools such as PlanSwift and Bluebeam Revu, price with RSMeans-style cost data and your own unit prices where you provide them, schedule in Oracle Primavera P6 or Microsoft Project when needed, and organize quantities by CSI MasterFormat (Division 09). Estimating is done remotely from your drawings, so we support public and private projects in every state.
Why contractors outsource tile estimating
Bid season compresses the time estimators have for each solicitation. Outsourcing the tile takeoff and pricing lets your team cover more bids, respond to addenda quickly and keep an independent check on subcontractor and supplier numbers. You keep control of the bid: you review the quantities, adjust unit costs and decide the final price.
Public, private and prevailing-wage projects
We price this scope on public solicitations (IFB, ITB and RFP responses) and private open-shop projects alike. When the solicitation includes a prevailing-wage or Davis-Bacon wage determination, we apply the stated rates and fringe benefits to the labor in each line item and allow for certified payroll administration. See public bid estimating and our prevailing wage guide.
Related services and pages
Combine this scope with quantity takeoff, bid leveling and proposal support, pre-bid and post-bid support, shop drawings and CPM scheduling. Browse every CSI division page, read the CSI MasterFormat guide or check the bidding glossary.
Frequently asked questions
How much waste do you add for tile?
+
We apply waste by tile format and layout (straight, offset, diagonal, mosaic) and state it clearly in the estimate so you can adjust it.
Do you price setting materials and waterproofing?
+
Yes. Thinset, mortar beds, membranes, grout and trim are included in the takeoff and pricing unless you ask for tile only.
Can you provide tile layout drawings?
+
Yes. See our tile layout and shop drawings service for approval-ready layouts.
Bid Sharp at a glance: 3 steps, 50 states
Bid Sharp prepares construction estimates, takeoffs, shop drawings, structural and permit drawings and schedules for contractors and homeowners in all 50 states, on public and private projects. Typical turnaround is about 48 hours; the turnaround and a firm price are confirmed before any work starts.
- 1. Upload plans. Send PDF, DWG or a plan-room link with your bid due date.
- 2. Get a firm quote. Scope, price and turnaround in writing, with no obligation.
- 3. Receive deliverables. Excel and PDF files, plus DWG for drawings, checked by 2 team members.
Standards and official sources
Rules, wage rates, codes and procurement procedures change and differ by agency. Confirm the requirements that apply to your project with these primary sources and with the solicitation itself.
Keep exploring
Last updated by the Bid Sharp estimating team.