FAQ
Construction Estimating & Bidding FAQ
Direct answers on estimating, takeoff, pre-bid and post-bid process, solicitations, prevailing wage, shop drawings, permit drawings, pricing and turnaround.
Getting started
What does Bid Sharp do?+
Bid Sharp provides construction estimating, quantity takeoff, bid preparation, structural drafting, permit drawings, shop drawings, solar plan sets and CPM scheduling for general contractors, subcontractors, developers and homeowners across the United States, on public and private projects.
How do I get a quote?+
Upload your plans or paste a plan-room link on the contact page, add your bid due date and the service you need. We review the documents and reply with the scope, a firm price and a turnaround time before any work begins, with no obligation.
What files can I send?+
PDF plans are ideal. We also accept DWG, DXF, ZIP archives, images and Office documents, plus links from Dropbox, Google Drive, BuildingConnected and other plan rooms. Include specifications, addenda, bid forms and your bid date whenever you have them.
Do you work with homeowners as well as contractors?+
Yes. Homeowners and developers use independent estimates to budget remodels and new builds and to compare contractor quotes. Contractors use our services to bid more projects without adding staff.
Which states do you serve?+
All 50 states. Estimating and drafting are done remotely from your drawings, so project location does not limit coverage. We focus on Texas, California and fast-growing markets with fewer estimating options.
Estimating and takeoff
What is construction estimating?+
Construction estimating predicts a project's cost from its drawings and specifications by measuring quantities, pricing labor, materials, equipment and subcontract scopes, and adding general conditions, overhead, profit, taxes, bonds, insurance and contingency. An accurate estimate lets a contractor bid competitively and protect margin.
What is a material takeoff?+
A material or quantity takeoff is the measured list of items needed to build a project: square feet, linear feet, cubic yards, counts and weights taken from the plans. The estimate then prices those quantities. You can order a takeoff alone or a complete priced estimate.
Which trades and CSI divisions do you cover?+
We cover CSI MasterFormat Divisions 01 through 33, including general requirements, concrete, masonry, metals, wood framing, roofing, openings, finishes, tile, drywall, plumbing, HVAC, fire protection, electrical, low voltage, sitework and utilities, plus solar.
How accurate are your estimates?+
Accuracy depends on drawing quality and scope clarity. Every takeoff is measured from the latest documents on marked-up plans, checked by a second estimator and compared with expected ratios. Assumptions, allowances and exclusions are written down so you can see exactly what the number covers.
Do you price labor and materials?+
Yes. We price material, labor, equipment and subcontract scopes using current market data and your unit prices when you provide them. You can also order quantities only and price the work yourself.
What software do you use?+
Digital takeoff in PlanSwift and Bluebeam Revu, pricing in Excel with RSMeans-style cost data, scheduling in Oracle Primavera P6 and Microsoft Project, and drafting in AutoCAD-compatible formats. Deliverables are Excel and PDF, with DWG for drawings.
Bidding: pre-bid, post-bid and solicitations
What is the pre-bid process?+
The pre-bid process includes reviewing the solicitation and bid form, attending the pre-bid conference and site visit, logging addenda, submitting requests for information (RFIs), completing the takeoff and pricing, pricing alternates and unit prices, and completing the bid package before the due date.
What is the post-bid process?+
After bids are opened, the work includes reviewing the bid tabulation, leveling subcontractor bids to a common scope, sending clarifications, pricing value-engineering options, receiving a notice of award, executing the contract and bonds, and buying out subcontracts and purchase orders.
What is the difference between an IFB, ITB and RFP?+
An Invitation for Bid or Invitation to Bid is a sealed, price-based competition usually awarded to the lowest responsive and responsible bidder. A Request for Proposal evaluates qualifications, approach and price against stated criteria and may allow negotiation.
What are addenda and why do they matter?+
Addenda are official changes to the bid documents: revised drawings, new specifications, added alternates or extended dates. Missing one can mean pricing outdated documents or failing to acknowledge it on the bid form, which can make a bid non-responsive.
What is bid leveling?+
Bid leveling adjusts competing subcontractor and supplier proposals to a common scope by identifying inclusions, exclusions, alternates and qualifications, so the general contractor can compare them fairly and choose on adjusted price and risk.
What are alternates, allowances and unit prices?+
Alternates are priced options the owner may add or deduct. Allowances are owner-set amounts for items not yet selected. Unit prices are per-unit costs used to adjust the contract if quantities change. Each must be priced separately and tied to the bid form.
What is an RFI in construction?+
A request for information is a written question that clarifies a conflict, omission or ambiguity in the drawings or specifications. During bidding, RFIs are submitted before the question deadline and answered through addenda.
Public bids and prevailing wage
Can you estimate public and government projects?+
Yes. We estimate from solicitation documents, including drawings, specifications, addenda, bid forms, alternates and unit prices, for federal, state, local and school-district projects. The contractor reviews, signs and submits the bid.
How do you handle prevailing wage and Davis-Bacon?+
We apply the wage determination stated in your solicitation to the labor in each estimate line, including fringe benefits and burden, and allow for payroll reporting costs. Always confirm current rates and requirements with the awarding agency.
Do you estimate private open-shop projects?+
Yes. Private open-shop projects use market labor rates unless a contract or funding source imposes prevailing-wage terms. The estimating method is the same; the labor assumptions change.
Do you submit bids for contractors?+
No. We prepare takeoffs, pricing and supporting documents, and the contractor reviews, signs and submits the bid in its own name.
Drawings: shop, structural, permit and solar
What are shop drawings?+
Shop drawings are detailed drawings prepared by the contractor, subcontractor or fabricator showing how part of the work will be fabricated and installed, based on the contract drawings and specifications. They are reviewed by the general contractor and the design team.
What is the difference between shop drawings and submittals?+
Shop drawings are one type of submittal. Submittals also include product data, samples, mock-ups, calculations, test reports and closeout documents.
Do your structural or permit drawings come with an engineer's seal?+
We provide drafting. Drawings that require a professional seal are reviewed and sealed by an engineer or architect licensed in the project's jurisdiction, coordinated through a licensed professional.
Can you prepare permit drawings for my jurisdiction?+
We prepare permit drawings to your building department's submittal checklist and revise them after plan-review comments. Send the checklist with your project information.
Do you prepare solar permit plan sets?+
Yes. Solar plan sets include site and roof plans, array layout, single-line diagram, equipment schedule and labels, prepared to the AHJ and utility requirements you provide.
Pricing, turnaround and process
How much does an estimate cost?+
Cost depends on project size, number of trades, drawing quality and turnaround. We quote a firm price after reviewing your documents and before work starts. Use the contact page to upload plans for a free quote.
How long does an estimate take?+
Typical turnaround is about 48 hours, depending on size and complexity. We confirm turnaround in the quote and offer rush options when your bid date is tight.
Do you review estimates before delivery?+
Yes. A second estimator reviews the takeoff and pricing before delivery, and quantities are traceable to marked-up plans.
What happens if addenda are issued after I send plans?+
Send the addenda as soon as you receive them. We re-measure the affected scope and update the estimate so it reflects the latest documents.
Are my plans kept confidential?+
Your files are used only to prepare your quote and project work and are not shared publicly. See our privacy policy for details.
Related: construction estimating glossary · how pricing works · estimating guides
Get an accurate construction estimate for your next bid
Upload your plans for a free quote on estimating, takeoff, structural or permit drawings. We reply with scope, price and turnaround.
Upload Plans & Get a QuoteBid Sharp at a glance: 3 steps, 50 states
Bid Sharp prepares construction estimates, takeoffs, shop drawings, structural and permit drawings and schedules for contractors and homeowners in all 50 states, on public and private projects. Typical turnaround is about 48 hours; the turnaround and a firm price are confirmed before any work starts.
- 1. Upload plans. Send PDF, DWG or a plan-room link with your bid due date.
- 2. Get a firm quote. Scope, price and turnaround in writing, with no obligation.
- 3. Receive deliverables. Excel and PDF files, plus DWG for drawings, checked by 2 team members.
Quick answers
How do I get a quote?
Upload your plans on the contact page; we reply with scope, price and turnaround before work begins.
Which states and trades do you cover?
All 50 states and CSI Divisions 01–33, plus solar. See services and locations.
Do you submit bids for contractors?
No. We prepare the takeoff, pricing and documents; the contractor reviews, signs and submits the bid. Read the FAQ.
Standards and official sources
Rules, wage rates, codes and procurement procedures change and differ by agency. Confirm the requirements that apply to your project with these primary sources and with the solicitation itself.
Keep exploring
Last updated by the Bid Sharp estimating team.