Bid Sharp logo Bid Sharp

Plumbing Estimating and Takeoff Services for Plumbing Contractors

Fixtures, piping, valves, water heaters and underground plumbing takeoffs for plumbing subcontractors.

Get a Free Quote
Plumbing Estimating Services (Division 22)

Plumbing Estimating Services (Division 22) is counting plumbing fixtures and measuring domestic water, sanitary, vent, storm and gas piping from plans and risers, then pricing materials, labor and equipment.

We separate underground, in-slab, above-ground and in-wall piping, count fixtures from the schedule, and price equipment such as water heaters, pumps and backflow preventers.

What we measure and price

ItemUnitNotes
Plumbing fixtures and trimEABy fixture schedule and mounting
Domestic hot and cold water pipingLF / EACopper, PEX and fittings by size
Sanitary and vent pipingLF / EACast iron, PVC and fittings
Storm drainage and roof drainsLF / EAInterior storm and drains
Gas piping and equipment connectionsLF / EANatural gas and medical gas
Water heaters, pumps and backflowEAPer equipment schedule
Insulation, testing and sterilizationLS / LFPer specification

Specifications and CSI MasterFormat references

Division 22 includes 22 05 00 Common Work Results for Plumbing, 22 11 16 Domestic Water Piping, 22 13 16 Sanitary Waste and Vent Piping and 22 40 00 Plumbing Fixtures, following the adopted plumbing code. We read the specification section alongside the drawings so that products, performance requirements, testing, warranties and allowances are priced the way the solicitation intends — not just what appears on the plan sheets.

Pre-bid review: what we check before pricing

  • Scope definition: what is in your trade and what belongs to others, with inclusions and exclusions written down.
  • Addenda and bulletins: every addendum is logged and its effect on quantities, alternates and unit prices is carried into the estimate.
  • Requests for information (RFIs): conflicts between drawings and specifications are listed so they can be submitted before the question deadline.
  • Alternates, allowances and unit prices: priced separately and tied to the bid form so the proposal is complete and responsive.
  • Bid form and qualifications: required line items, bond and insurance requirements, prevailing-wage or Davis-Bacon language and any bid-day instructions are flagged.

Pricing considerations that move the number

  • Underground work and trenching are priced separately.
  • Pipe material (copper, PEX, PVC, cast iron) changes labor.
  • Fixture count, ADA requirements and access.
  • Testing, inspections and sterilization.

Submittals and shop drawings for this scope

Plumbing submittals are product and coordination documents.

  • Fixture, valve and equipment cutsheets
  • Pipe and fitting product data
  • Coordination drawings for risers and ceilings
  • Test and sterilization reports

We prepare shop drawings and submittal packages for many of these scopes, and we can resubmit after architect or engineer comments.

Common estimating mistakes we help you avoid

  • Counting fixtures without trim, stops and carriers
  • Missing underground, cleanouts and floor drains
  • Ignoring insulation and testing
  • Under-pricing coordination in congested ceilings

What you get

  • Marked-up plans showing every count and measurement
  • Quantity takeoff organized by area, system and CSI section
  • Material, labor, equipment and subcontract pricing (or takeoff only)
  • Clear assumptions, inclusions, exclusions, alternates and unit prices
  • Excel and PDF files ready to drop into your bid or post-bid scope sheets
  • Support on addenda, clarifications and bid leveling after delivery

Who this is for

Plumbing subcontractors, mechanical contractors and general contractors.

How it works

  1. Upload your plans, specifications and addenda, or paste a plan-room link, with your bid due date.
  2. We confirm scope, price and turnaround before any work starts.
  3. Our estimators complete the takeoff and pricing and a second estimator reviews it.
  4. You receive the files and we stay available for addenda, RFIs and post-bid clarifications.

Software and standards

We take off in digital takeoff tools such as PlanSwift and Bluebeam Revu, price with RSMeans-style cost data and your own unit prices where you provide them, schedule in Oracle Primavera P6 or Microsoft Project when needed, and organize quantities by CSI MasterFormat (Division 22). Estimating is done remotely from your drawings, so we support public and private projects in every state.

Why contractors outsource plumbing estimating

Bid season compresses the time estimators have for each solicitation. Outsourcing the plumbing takeoff and pricing lets your team cover more bids, respond to addenda quickly and keep an independent check on subcontractor and supplier numbers. You keep control of the bid: you review the quantities, adjust unit costs and decide the final price.

Public, private and prevailing-wage projects

We price this scope on public solicitations (IFB, ITB and RFP responses) and private open-shop projects alike. When the solicitation includes a prevailing-wage or Davis-Bacon wage determination, we apply the stated rates and fringe benefits to the labor in each line item and allow for certified payroll administration. See public bid estimating and our prevailing wage guide.

Related services and pages

Combine this scope with quantity takeoff, bid leveling and proposal support, pre-bid and post-bid support, shop drawings and CPM scheduling. Browse every CSI division page, read the CSI MasterFormat guide or check the bidding glossary.

Frequently asked questions

Do you separate underground plumbing?

+

Yes. Underground and in-slab work is priced separately from above-ground piping.

Bid Sharp at a glance: 3 steps, 50 states

Bid Sharp prepares construction estimates, takeoffs, shop drawings, structural and permit drawings and schedules for contractors and homeowners in all 50 states, on public and private projects. Typical turnaround is about 48 hours; the turnaround and a firm price are confirmed before any work starts.

  1. 1. Upload plans. Send PDF, DWG or a plan-room link with your bid due date.
  2. 2. Get a firm quote. Scope, price and turnaround in writing, with no obligation.
  3. 3. Receive deliverables. Excel and PDF files, plus DWG for drawings, checked by 2 team members.

Quick answers

How do I get a quote?

Upload your plans on the contact page; we reply with scope, price and turnaround before work begins.

Which states and trades do you cover?

All 50 states and CSI Divisions 01–33, plus solar. See services and locations.

Do you submit bids for contractors?

No. We prepare the takeoff, pricing and documents; the contractor reviews, signs and submits the bid. Read the FAQ.

Standards and official sources

Rules, wage rates, codes and procurement procedures change and differ by agency. Confirm the requirements that apply to your project with these primary sources and with the solicitation itself.

Keep exploring

Last updated by the Bid Sharp estimating team.

Call Upload Plans