Furnishings Estimating: Casework, Window Treatments and Fixed Seating
Fixed furnishings, casework, window treatments, fixed seating and countertops priced from schedules and elevations.
Get a Free Quote
Furnishings Estimating (Division 12) is measuring and pricing furnishings that are part of the construction contract, such as casework, countertops, window treatments, fixed seating and mats.
We separate fixed furnishings from loose FF&E, price from elevations and schedules, and note allowances and owner-furnished items.
What we measure and price
| Item | Unit | Notes |
|---|---|---|
| Casework and countertops | LF / SF | Cabinets, solid surface, stone |
| Window treatments | EA / SF | Shades and blinds by window schedule |
| Fixed seating | EA / LF | Auditorium, bleacher and bench seating |
| Mats and entrance flooring | SF | Walk-off systems |
| Installation and finishing | LS | Per assembly |
Specifications and CSI MasterFormat references
Division 12 includes 12 32 00 Manufactured Wood Casework, 12 36 00 Countertops and 12 24 00 Window Shades. We read the specification section alongside the drawings so that products, performance requirements, testing, warranties and allowances are priced the way the solicitation intends — not just what appears on the plan sheets.
Pre-bid review: what we check before pricing
- Scope definition: what is in your trade and what belongs to others, with inclusions and exclusions written down.
- Addenda and bulletins: every addendum is logged and its effect on quantities, alternates and unit prices is carried into the estimate.
- Requests for information (RFIs): conflicts between drawings and specifications are listed so they can be submitted before the question deadline.
- Alternates, allowances and unit prices: priced separately and tied to the bid form so the proposal is complete and responsive.
- Bid form and qualifications: required line items, bond and insurance requirements, prevailing-wage or Davis-Bacon language and any bid-day instructions are flagged.
Pricing considerations that move the number
- Finish grade and material selections.
- Lead times for custom casework.
- Coordination with blocking and utilities.
- Allowances for owner selections.
Submittals and shop drawings for this scope
Furnishings submittals include samples and shop drawings.
- Casework shop drawings and finish samples
- Countertop templates and seam layouts
- Window-treatment schedules and samples
- Product data and warranties
We prepare shop drawings and submittal packages for many of these scopes, and we can resubmit after architect or engineer comments.
Common estimating mistakes we help you avoid
- Counting casework by linear feet without upper and tall units
- Missing countertop cutouts, edges and backsplash
- Not separating FF&E by owner
- Ignoring finish selection allowances
What you get
- Marked-up plans showing every count and measurement
- Quantity takeoff organized by area, system and CSI section
- Material, labor, equipment and subcontract pricing (or takeoff only)
- Clear assumptions, inclusions, exclusions, alternates and unit prices
- Excel and PDF files ready to drop into your bid or post-bid scope sheets
- Support on addenda, clarifications and bid leveling after delivery
Who this is for
Casework and millwork contractors, interior contractors and general contractors.
How it works
- Upload your plans, specifications and addenda, or paste a plan-room link, with your bid due date.
- We confirm scope, price and turnaround before any work starts.
- Our estimators complete the takeoff and pricing and a second estimator reviews it.
- You receive the files and we stay available for addenda, RFIs and post-bid clarifications.
Software and standards
We take off in digital takeoff tools such as PlanSwift and Bluebeam Revu, price with RSMeans-style cost data and your own unit prices where you provide them, schedule in Oracle Primavera P6 or Microsoft Project when needed, and organize quantities by CSI MasterFormat (Division 12). Estimating is done remotely from your drawings, so we support public and private projects in every state.
Why contractors outsource furnishings estimating
Bid season compresses the time estimators have for each solicitation. Outsourcing the furnishings takeoff and pricing lets your team cover more bids, respond to addenda quickly and keep an independent check on subcontractor and supplier numbers. You keep control of the bid: you review the quantities, adjust unit costs and decide the final price.
Public, private and prevailing-wage projects
We price this scope on public solicitations (IFB, ITB and RFP responses) and private open-shop projects alike. When the solicitation includes a prevailing-wage or Davis-Bacon wage determination, we apply the stated rates and fringe benefits to the labor in each line item and allow for certified payroll administration. See public bid estimating and our prevailing wage guide.
Related services and pages
Combine this scope with quantity takeoff, bid leveling and proposal support, pre-bid and post-bid support, shop drawings and CPM scheduling. Browse every CSI division page, read the CSI MasterFormat guide or check the bidding glossary.
Frequently asked questions
Is loose furniture included?
+
We price fixed furnishings in the construction contract; loose FF&E is normally by the owner.
Bid Sharp at a glance: 3 steps, 50 states
Bid Sharp prepares construction estimates, takeoffs, shop drawings, structural and permit drawings and schedules for contractors and homeowners in all 50 states, on public and private projects. Typical turnaround is about 48 hours; the turnaround and a firm price are confirmed before any work starts.
- 1. Upload plans. Send PDF, DWG or a plan-room link with your bid due date.
- 2. Get a firm quote. Scope, price and turnaround in writing, with no obligation.
- 3. Receive deliverables. Excel and PDF files, plus DWG for drawings, checked by 2 team members.
Quick answers
How do I get a quote?
Upload your plans on the contact page; we reply with scope, price and turnaround before work begins.
Which states and trades do you cover?
All 50 states and CSI Divisions 01–33, plus solar. See services and locations.
Do you submit bids for contractors?
No. We prepare the takeoff, pricing and documents; the contractor reviews, signs and submits the bid. Read the FAQ.
Standards and official sources
Rules, wage rates, codes and procurement procedures change and differ by agency. Confirm the requirements that apply to your project with these primary sources and with the solicitation itself.
Keep exploring
Last updated by the Bid Sharp estimating team.