Bid Sharp logo Bid Sharp

Equipment Estimating: Commercial Kitchen, Laboratory and Specialty Equipment

Foodservice, laboratory, loading dock, athletic and other installed equipment priced from equipment schedules.

Get a Free Quote
Equipment Estimating (Division 11)

Equipment Estimating (Division 11) is pricing the installed equipment shown on equipment schedules and plans, including coordination with the mechanical, electrical and plumbing trades that serve it.

Equipment is often owner-furnished and contractor-installed. We separate equipment supply, installation and utility connections so responsibilities are clear.

What we measure and price

ItemUnitNotes
Foodservice equipmentEA / LSSchedules, hoods and connections
Laboratory and medical equipmentEA / LSFume hoods, casework and utilities
Loading dock equipmentEALevelers, seals and bumpers
Athletic and recreational equipmentEA / LSPer specification
Utility connectionsEA / LSElectrical, plumbing and ventilation by others
Installation and commissioningLSReceiving, setting and start-up

Specifications and CSI MasterFormat references

Division 11 includes 11 40 00 Foodservice Equipment, 11 53 00 Laboratory Equipment, 11 13 00 Loading Dock Equipment and 11 66 00 Athletic Equipment. We read the specification section alongside the drawings so that products, performance requirements, testing, warranties and allowances are priced the way the solicitation intends — not just what appears on the plan sheets.

Pre-bid review: what we check before pricing

  • Scope definition: what is in your trade and what belongs to others, with inclusions and exclusions written down.
  • Addenda and bulletins: every addendum is logged and its effect on quantities, alternates and unit prices is carried into the estimate.
  • Requests for information (RFIs): conflicts between drawings and specifications are listed so they can be submitted before the question deadline.
  • Alternates, allowances and unit prices: priced separately and tied to the bid form so the proposal is complete and responsive.
  • Bid form and qualifications: required line items, bond and insurance requirements, prevailing-wage or Davis-Bacon language and any bid-day instructions are flagged.

Pricing considerations that move the number

  • Owner-furnished contractor-installed (OFCI) vs contractor-furnished items.
  • Utility rough-ins and coordination with other trades.
  • Delivery, rigging and storage.
  • Start-up, testing and training requirements.

Submittals and shop drawings for this scope

Equipment submittals are coordination documents.

  • Equipment cutsheets and rough-in drawings
  • Utility connection schedules
  • Installation drawings and templates
  • Operation and maintenance manuals

We prepare shop drawings and submittal packages for many of these scopes, and we can resubmit after architect or engineer comments.

Common estimating mistakes we help you avoid

  • Missing the utility connections that belong to other trades
  • Confusing owner-furnished and contractor-furnished scope
  • Ignoring rigging and delivery costs
  • Leaving out commissioning and training

What you get

  • Marked-up plans showing every count and measurement
  • Quantity takeoff organized by area, system and CSI section
  • Material, labor, equipment and subcontract pricing (or takeoff only)
  • Clear assumptions, inclusions, exclusions, alternates and unit prices
  • Excel and PDF files ready to drop into your bid or post-bid scope sheets
  • Support on addenda, clarifications and bid leveling after delivery

Who this is for

Equipment installers, general contractors and facility owners.

How it works

  1. Upload your plans, specifications and addenda, or paste a plan-room link, with your bid due date.
  2. We confirm scope, price and turnaround before any work starts.
  3. Our estimators complete the takeoff and pricing and a second estimator reviews it.
  4. You receive the files and we stay available for addenda, RFIs and post-bid clarifications.

Software and standards

We take off in digital takeoff tools such as PlanSwift and Bluebeam Revu, price with RSMeans-style cost data and your own unit prices where you provide them, schedule in Oracle Primavera P6 or Microsoft Project when needed, and organize quantities by CSI MasterFormat (Division 11). Estimating is done remotely from your drawings, so we support public and private projects in every state.

Why contractors outsource equipment estimating

Bid season compresses the time estimators have for each solicitation. Outsourcing the equipment takeoff and pricing lets your team cover more bids, respond to addenda quickly and keep an independent check on subcontractor and supplier numbers. You keep control of the bid: you review the quantities, adjust unit costs and decide the final price.

Public, private and prevailing-wage projects

We price this scope on public solicitations (IFB, ITB and RFP responses) and private open-shop projects alike. When the solicitation includes a prevailing-wage or Davis-Bacon wage determination, we apply the stated rates and fringe benefits to the labor in each line item and allow for certified payroll administration. See public bid estimating and our prevailing wage guide.

Related services and pages

Combine this scope with quantity takeoff, bid leveling and proposal support, pre-bid and post-bid support, shop drawings and CPM scheduling. Browse every CSI division page, read the CSI MasterFormat guide or check the bidding glossary.

Frequently asked questions

Do you coordinate equipment utilities?

+

Yes. We list the electrical, plumbing and mechanical connections required so they are carried by the right trade.

Bid Sharp at a glance: 3 steps, 50 states

Bid Sharp prepares construction estimates, takeoffs, shop drawings, structural and permit drawings and schedules for contractors and homeowners in all 50 states, on public and private projects. Typical turnaround is about 48 hours; the turnaround and a firm price are confirmed before any work starts.

  1. 1. Upload plans. Send PDF, DWG or a plan-room link with your bid due date.
  2. 2. Get a firm quote. Scope, price and turnaround in writing, with no obligation.
  3. 3. Receive deliverables. Excel and PDF files, plus DWG for drawings, checked by 2 team members.

Quick answers

How do I get a quote?

Upload your plans on the contact page; we reply with scope, price and turnaround before work begins.

Which states and trades do you cover?

All 50 states and CSI Divisions 01–33, plus solar. See services and locations.

Do you submit bids for contractors?

No. We prepare the takeoff, pricing and documents; the contractor reviews, signs and submits the bid. Read the FAQ.

Standards and official sources

Rules, wage rates, codes and procurement procedures change and differ by agency. Confirm the requirements that apply to your project with these primary sources and with the solicitation itself.

Keep exploring

Last updated by the Bid Sharp estimating team.

Call Upload Plans