Bid Sharp logo Bid Sharp

Demolition and Existing Conditions Estimating Services

Selective demolition, abatement coordination, site clearing and existing-conditions takeoffs for renovation and sitework bids.

Get a Free Quote
Demolition and Existing Conditions Estimating (Division 02)

Demolition and Existing Conditions Estimating (Division 02) is measuring and pricing selective demolition, structure removal, site clearing, hazardous-material coordination and hauling shown on demolition plans and in Division 02.

Renovation bids depend on how well existing conditions are understood. We measure demolition by area, assembly and floor, separate salvage and protection work, and price labor, equipment, hauling, dump fees and shoring.

What we measure and price

ItemUnitNotes
Selective interior demolitionSF / EAPartitions, ceilings, flooring, fixtures by room
Structure and slab demolitionSF / CYSaw-cutting, breaking, removal of footings and slabs
Site clearing and tree removalSF / EAClearing, grubbing, stump removal
Hauling and disposalTON / CY / LDTruck loads, dump fees, recycling
Protection and shoringLS / LFDust barriers, temporary bracing, protection of adjacent work
Abatement coordinationLSAllowances where hazardous materials are identified

Specifications and CSI MasterFormat references

Division 02 covers Existing Conditions, including 02 41 00 Demolition, 02 82 00 Asbestos Remediation and 02 83 00 Lead Remediation. Hazardous-material work is typically performed by licensed abatement contractors, and we carry allowances rather than pricing licensed abatement ourselves. We read the specification section alongside the drawings so that products, performance requirements, testing, warranties and allowances are priced the way the solicitation intends — not just what appears on the plan sheets.

Pre-bid review: what we check before pricing

  • Scope definition: what is in your trade and what belongs to others, with inclusions and exclusions written down.
  • Addenda and bulletins: every addendum is logged and its effect on quantities, alternates and unit prices is carried into the estimate.
  • Requests for information (RFIs): conflicts between drawings and specifications are listed so they can be submitted before the question deadline.
  • Alternates, allowances and unit prices: priced separately and tied to the bid form so the proposal is complete and responsive.
  • Bid form and qualifications: required line items, bond and insurance requirements, prevailing-wage or Davis-Bacon language and any bid-day instructions are flagged.

Pricing considerations that move the number

  • Hazardous materials (asbestos, lead) require licensed abatement and clearance testing.
  • Access, noise and working-hour restrictions in occupied buildings.
  • Haul distance, dump fees and recycling requirements.
  • Unknown conditions behind finishes — allowances and unit prices matter.

Submittals and shop drawings for this scope

Demolition submittals focus on methods and protection.

  • Demolition and shoring plans
  • Dust, noise and vibration control plans
  • Waste management and recycling reports
  • Utility shut-off and capping coordination

We prepare shop drawings and submittal packages for many of these scopes, and we can resubmit after architect or engineer comments.

Common estimating mistakes we help you avoid

  • Pricing demolition without protection, shoring and dust control
  • Ignoring hazardous-material allowances or testing
  • Under-estimating haul and dump costs
  • Missing patching and make-good after removal

What you get

  • Marked-up plans showing every count and measurement
  • Quantity takeoff organized by area, system and CSI section
  • Material, labor, equipment and subcontract pricing (or takeoff only)
  • Clear assumptions, inclusions, exclusions, alternates and unit prices
  • Excel and PDF files ready to drop into your bid or post-bid scope sheets
  • Support on addenda, clarifications and bid leveling after delivery

Who this is for

Demolition and renovation contractors, general contractors and developers working on existing buildings.

How it works

  1. Upload your plans, specifications and addenda, or paste a plan-room link, with your bid due date.
  2. We confirm scope, price and turnaround before any work starts.
  3. Our estimators complete the takeoff and pricing and a second estimator reviews it.
  4. You receive the files and we stay available for addenda, RFIs and post-bid clarifications.

Software and standards

We take off in digital takeoff tools such as PlanSwift and Bluebeam Revu, price with RSMeans-style cost data and your own unit prices where you provide them, schedule in Oracle Primavera P6 or Microsoft Project when needed, and organize quantities by CSI MasterFormat (Division 02). Estimating is done remotely from your drawings, so we support public and private projects in every state.

Why contractors outsource demolition and existing conditions estimating

Bid season compresses the time estimators have for each solicitation. Outsourcing the demolition and existing conditions takeoff and pricing lets your team cover more bids, respond to addenda quickly and keep an independent check on subcontractor and supplier numbers. You keep control of the bid: you review the quantities, adjust unit costs and decide the final price.

Public, private and prevailing-wage projects

We price this scope on public solicitations (IFB, ITB and RFP responses) and private open-shop projects alike. When the solicitation includes a prevailing-wage or Davis-Bacon wage determination, we apply the stated rates and fringe benefits to the labor in each line item and allow for certified payroll administration. See public bid estimating and our prevailing wage guide.

Related services and pages

Combine this scope with quantity takeoff, bid leveling and proposal support, pre-bid and post-bid support, shop drawings and CPM scheduling. Browse every CSI division page, read the CSI MasterFormat guide or check the bidding glossary.

Frequently asked questions

Do you price asbestos abatement?

+

We carry allowances and coordinate scope, but licensed abatement is normally priced by licensed abatement contractors.

Can you separate demolition from new work?

+

Yes. Demolition is taken off separately so it can be bid as its own scope or carried inside the general contractor's estimate.

Bid Sharp at a glance: 3 steps, 50 states

Bid Sharp prepares construction estimates, takeoffs, shop drawings, structural and permit drawings and schedules for contractors and homeowners in all 50 states, on public and private projects. Typical turnaround is about 48 hours; the turnaround and a firm price are confirmed before any work starts.

  1. 1. Upload plans. Send PDF, DWG or a plan-room link with your bid due date.
  2. 2. Get a firm quote. Scope, price and turnaround in writing, with no obligation.
  3. 3. Receive deliverables. Excel and PDF files, plus DWG for drawings, checked by 2 team members.

Standards and official sources

Rules, wage rates, codes and procurement procedures change and differ by agency. Confirm the requirements that apply to your project with these primary sources and with the solicitation itself.

Keep exploring

Last updated by the Bid Sharp estimating team.

Call Upload Plans